Posted: May 22nd, 2023
To efficiently integrate PI and compact the design to obtain optimal solutions for specific requirements to be met, the following elements have to be incorporated in the above process, with some exceptions.
Sufficient space has to be made available to utilize carbon capture at different locations. These locations will accommodate additional carbon capture components in addition to establishing a balance within the plant to utilize cooling water and heat dissipated from elements in this process with the auxiliary power distributions for the capture equipment integrated into the system. Process intensification elements are located at various strategic points to ensure optimal use of space, mass transfer, and efficiency in capturing heat. The DeNOX equipment should incorporate pre-combustion and post-combustion PI measures to ensure systems efficiency in the capture of gases such as NO.
Place an order in 3 easy steps. Takes less than 5 mins.